Construction Site Storm Water Management

Construction Site Stormwater Runoff Control

 

Piedmont Virginia Community College (PVCC) is required to develop, implement and enforce a program to reduce the discharge of pollutants associated with construction activity into their municipal separate storm sewer system (MS4).  Erosion and Sediment Control (ESC) and Stormwater Management (SWM) Programs are integral components of all design, construction maintenance, and management of college facilities.

PVCC, in conjunction with Virginia Community College System, has implemented rules and regulations in its ESC and SWM programs, which are enforced during the planning, permitting and construction phase by PVCC staff and third party inspectors. Staff is responsible for conducting regular inspections of the site during construction. Public concern and input associated with runoff from construction activity is received by email at Kim McManus or by calling the Facilities Manager at (434) 961-5448.

VCCS Annual Standards and Specifications for Erosion & Sediment Control and Stormwater Management

Stormwater Pollution Prevention Plan (SWPPP)

For more information, refer to the EPA’s factsheet on Construction Site Stormwater Runoff Control.